The basemenet structure before. 2017/9/27 | |
Assembling the dome at the yard. 2017/9/28 | |
Travelling through Tibet town. 2017/10/2 | |
Transportation. 2017/10/2 | |
Installing the equatorial mount. 2017/9/29 | |
Inside of the dome. 2017/10/7 | |
Outside of the dome. 2017/10/7 | |
We did it. 2017/10/8 |